top of page

AQUAFENCE FLASHWALL

Ready before the rain.

Portable flood protection for entrances and building openings. 

TARGETED FLOOD PROTECTION

Small footprint.

A clear line of defence.

FlashWall by AquaFence

Protect the entrances and building openings. Prepare the mounting arrangement before a flood warning.

 

Deploy with confidence. Practise unfolding, positioning and securing your FlashWall using the supplied instructions.


Ready for reuse. After use, rinse, dry and inspect the barrier before folding it for storage.

FLASHWALL IN ACTION

See how readiness takes shape.

Readiness is a routine: prepare the opening, practise deployment and keep the barrier ready for the next warning. Watch FlashWall in use and see how its folding design brings practical flood protection to the entrance.

 

After deployment, clean and dry the barrier before storing it. Your site assessment and supplied instructions define the right mounting method, protection limits and maintenance routine.

YOUR ENTRANCE. YOUR FLASHWALL.

Find the  right fit for your entrances and building openings

Compare product lengths: X2 — 1,250 mm; X3 — 1,800 mm; X4 — 2,350 mm. All three are 500 mm high and 660 mm wide, with a listed maximum water depth of 500 mm.


The usable opening depends on the mounting arrangement. Confirm the fit and components before ordering. Install on flat, clean, continuous, non-permeable ground.

FlashWall Standard Models

A precise fit for your entrance

Custom lengths from 985 to 2,635 mm.
Confirm your opening and mounting arrangement before ordering.

FlashWall Custom Sizes

Complete your FlashWall setup

Mounting components, connectors, replacement gaskets and storage.
Match each part to your FlashWall configuration.

HOW FLASHWALL WORKS

Installation and deployment, explained.

See how FlashWall is installed and deployed at a building entrance. These four short videos combine clear animations with on-site demonstrations: explore the installation sequence, watch the barrier being unpacked and positioned, see how the mounting brackets are prepared, and compare the setup with sandbags.

​

Choose a video below to explore each part of the process. For installation and use at your own opening, follow the instructions supplied with your confirmed FlashWall configuration.

FlashWall FAQ

AquaFence -2605191_edited.jpg
aquafence-dark-blue-overlay-less-transparent-40-percent.png
  • Instagram
  • Facebook
  • X
  • LinkedIn

Copyright 2026 AquaFence

Contact Rowan Hodges at Bluemont

Discuss your Australian project with Rowan Hodges at Bluemont, AquaFence’s local partner. Call +61 499 645 763 or email rowan.hodges@bluemont.com.au.

FLOOD PROTECTION CONSULTATION

bottom of page