Nestlé


Solution:
In one case the system was installed in 0,7 meter deep water. Done through the use of a barge, lowering as sea cable.

Result/Benefits:
Could reopen flooded factory three months earlier than other factories despite already being flooded.

Problem:
Several factories in Thailand (2011), some already flooded and others threatened. Needed quickly assembly to be able to reassemble at another site as necessary.

Procedure:
Helped client analyze optimal solutions and helped install on site.